Last week’s “Scorpions On The Trail” Work Summaries
Tuesday September 29th – A crew of 4 Scorpions (Sig, Jean, Jeff R. and Mike S) started the clearing some winter ski and snowshoe trails in hopes that we will have a real winter this year. We began at close to Gold Lake CG and hiked the upper and lower Marilyn Lakes trail system. The log load was not too heavy, but it kept us busy until about 11AM. We then changed location to Gold Lake Sno-Park on the other side of FWY 58. After lamenting on the damage done to the Ski Patrol Cabin by vandals, we hiked up CJ Way about a half mile to where a very messy fir fell with limbs scattered all over.
Once we cleared the mess at CJ Way we drove further in on Abernathy Road close to Bechtel Shelter where another large log suspended chest high awaited us. After clearing that log, we drove back on Abernathy Road to the West View Shelter spur trail. We hiked up to the Westview shelter and started bucking logs which were scattered all the way to Odell Overlook. We completed bucking the last log of the day around 3PM and started heading back to the car. There is another half dozen or so logs on the way to Pengra Pass that we will come back to get.
Thanks to the trail scouts and our guide Mike S. this was a very efficient logout. We knew exactly where the logs were and what the best driving and hiking routes were. There were some very good learning logs too. Now let’s hope for a good snow season.
Thursday October 1 – A max sized Wilderness Trail crew of 12 headed back to battle with Black Creek trail #3551 in the Waldo Lake Wilderness Area. This was our 4th trip there this year in our continuing efforts to restore this trail which was heavily damaged in the 2022 Cedar Creek fire. We started at the west TH at the end of road 2421. All the roads in this area are still officially closed so we had to coordinate with the FS to be sure we could safely get in past the road and logging crews.
Once there we formed two XC teams with 5 crew members and the rest of us formed a tread crew. We hiked 1.3 miles in (all up) until we reached the switchback above Lillian Falls. Our forward progress on previous trips was halted on this switchback because every time we returned there were new logs down on the way in plus all the logs on the very steep switchback are large, complex and very time intensive. Today we decided to skip any new logs down on the way in and prioritize getting above the switchback.
The two XC crews got busy on two very difficult logs that took them much of the day to buck up and move off the trail. The tread crew started working just past these two logs. The original tread is mostly gone covered by rocks, limbs and charcoal logs on this steep hillside. We used a pre-fire GPS track to determine and recover the original trail alignment. After some searching, we finally found the point where the trail switches back and heads up towards a ridge and Nettie Creek. There were a number of additional large log tangles we had to work around but foot by foot we gradually restored the tread and continued our way up the trail. There is not much in the way of regrowth in this area other than very obstinate blackberry vines and occasional patches of OR grape and Thimbleberry.
During our lunch break the logging crew called on the radio seeking reinforcements. Three of us went back to help them complete bucking the logs and getting them off the trail, sometimes resulting in a spectacular roll down the steep side slope. By 2:30 the tread crew returned having completed another quarter mile of tread restoration. The logging crews managed to muscle through four more logs and we all headed back down to the cars for a 90-minute drive back.
Thanks to the great work by the crews working here the last two seasons, we now have less than .7 miles of trail to recover before we reach the point we previously worked from the Waldo Lk side. They are a tough .7 miles, but we plan one more amphibious assault from the Waldo Lk side on one more trip from the west 2421 TH to try and connect the dots.
We hope to see you on the trail soon.
Next week's projects:
Thursday Oct 15th - North Fork Puncheons
Sign up link: https://bttr.im/a3pm3
Thursday Oct 22nd - Black Creek Amphibious Assault
Sign up link: https://bttr.im/bxdjo
Saturday Oct 24th - Grasshopper Chainsaw logout and brushing
Sign up link: https://bttr.im/2itqs