05/28/2026
The post-fire cleanup is officially underway. This is just a LITTLE bit different from what we had planned for the summer. We’re doing our best to focus on the positives through it all.
One of those positives is that we are going to be able to save more than we were previously told - including our original 1859 ceiling. Our remediation team was able to rig up a system to dry the wood from above, allowing us to retain the most historic feature in the building. 🙌
Along with that, some of the walls on the first floor can also stay in place. As for the floors, well… they have to completely go, all of the 150+ years of layers. So everything on them has to be moved out. But there’s a silver lining there too as we’ll get to replace our 70’s-style vinyl tile with a brand new floor.
Challenging circumstances, for sure. But there are so many positives to get us through!